How it works

Four steps. We do most of them.

You give us the basics. We do the running around. You get the sign-off in your hand.

01

5 minutes

You order online

Pop in the site address and how many plots. Pay the fixed fee. That's the last bit of paperwork you do today.

02

10 minutes

You upload the site plan

In your portal: drag the site layout in, the planning reference, and your Building Control reference if you've got it. Auto-saves as you go.

03

7–10 working days

We sort the broadband

We line up Openreach, draw up the connectivity plan in the format Building Control wants, and get it lodged. We email you when it's done.

04

Same day

You get the sign-off letter

A 1310-stamped letter and the connectivity plan, ready to hand to your Building Control inspector. Condition discharged.

No callbacks. No phone tag.

Start online — we’ll only call if we genuinely need something.

Get started