Same-day compliance certificate · automated delivery
Your compliance certificate, the day you need it.
Got a planning condition saying you need fibre broadband to your new homes? Place your order, drop in the site plan — and the moment we sign off, our system delivers your stamped certificate to your inbox. No waiting. No chasing. Hand it straight to Building Control.
Same day
Certificate delivered the moment we sign off
Automated
Straight to your inbox — no email chains
From £750
Per plot. Tiered — bigger sites pay less.
Trusted by builders across the UK
What you actually get
Three things, then you’re done.
No surveyor visits. No long forms. No phone tag with the big ISPs.
Tell us about the site
Address, how many plots, what stage you're at. Five minutes online — pay a fixed fee.
Drop the site plan in
Upload your layout drawing and your planning ref. We do the rest behind the scenes.
You get the sign-off letter
Stamped, signed, and ready to hand to Building Control. Condition discharged. Job done.
Pricing
Tiered by plot. Bigger sites pay less per home.
One fee, no surprises — and it gets cheaper per plot as the site grows. Slide to price your site instantly.
Number of plots
Breakdown
- 5 × £750 (plots 1–5)£3,750
+ VAT
Small
1–5 homes
£750/plot + VAT
- £750 + VAT per plot
- Same-day stamped certificate on completion
- Connection arranged with Openreach
- Sign-off letter Building Control accepts
Medium
6–10 homes
£500/plot 6–10 + VAT
- First 5 plots at £750, then £500 + VAT per plot
- Automated certificate delivery — instant on sign-off
- One named contact from start to finish
- Phased certificates as plots complete
Large
11–20 homes
£300/plot 11–20 + VAT
- Then £300 + VAT per plot from plot 11
- Same-day automated certificate delivery
- Site walk-throughs included
- Multiple operators considered
20+ homes
Bespoke
POA
- Price on application
- Bespoke programme, phased delivery
- Multi-operator coordination
- Dedicated project lead
Additive pricing — a 6-plot site is 5 × £750 + 1 × £500. The fibre connection itself is covered separately by government’s £2,000-per-home subsidy; we manage it and pass the quote through at cost.
What developers say
Real builders. Real sites. Real sign-offs.
Honestly, I'd been ignoring the broadband bit on planning. 1310 sorted it in a week and I haven't thought about it since.
James Cartwright
Director, Cartwright Homes
Our Building Control inspector wanted the connectivity plan before he'd validate. Uploaded the site plan on Tuesday, had the letter Friday. Cracking service.
Sarah Mead
Project Manager, Mead & Sons
I'm a 6-plot self-builder. None of the big ISPs would even reply. 1310 didn't blink — got the certificate the same day. Done.
Tom Hartwell
Owner, Hartwell Build Co
Accredited and partnered with the bodies Building Control recognises
Larger sites
Our own fibre. Your own terms.
For larger developments we don’t have to wait on Openreach. 1310 operates its own fibre network — so when the standard route doesn’t fit your programme, your site, or your commercial plan, we can build a bespoke solution and stand behind it ourselves.
- Independent of incumbent operators — we control the build
- Bespoke routing and phasing to match your construction programme
- Commercial flexibility on adoption, ownership and tenant choice
- Same compliance certificate, signed off by us
By the numbers
1,200+
Plots signed off
7 days
Avg. turnaround
100%
Building Control acceptance
£0
Hidden fees
Ready when you are.
Five minutes to start. No callbacks needed.